This is a Emergency and Ambulance Metric Dashboard (Diamond) Report, it is one of reports that Balanced Scorecard Designer can generate for Emergency and Ambulance KPI. With this software you can also design your own scorecards, KPIs and metrics.


Emergency and Ambulance Service Scorecard

Report includes: 2 day(s), from 12.04.2009 to 13.04.2009

  Name Start value End value Dynamic Contains
Root Emergency and Ambulance Service Scorecard  48,95 % 53,75 % + 4,8 %
Vehicle and Fleet Management Perspective(33,5%, -3,55%Down)
Pre Hospital Medical Equipment Perspective(73,2%, 21,08%Up)
Operational Efficiency Perspective(47,7%, -7,44%Down)
Support Centre and Service Reach Perspective(61%, 5,11%Up)

Graph for Emergency and Ambulance Service Scorecard

Graph for Emergency and Ambulance Service Scorecard

Data for Emergency and Ambulance Service Scorecard

DatesValue
12.04.200948,95
13.04.200953,75


Vehicle and Fleet Management Perspective

  Name Start value End value Dynamic Parent Contains
Root Vehicle and Fleet Management Perspective SLYellow 37,06 % 33,51 % -3,55% Emergency and Ambulance Service Scorecard
Indicators
Number of Ambulances
Number of Rapid Response Vehicles
% rise in Patient Transport Service (PTS) Vehicles
% Rise in Number of Medical Rescuers/Staff *
* - Information for this metric is limited in sample report Description This perspective showcases the vehicle and fleet management aspect of the Emergency and Ambulance Service organization.

Graph for Vehicle and Fleet Management Perspective

Graph for Vehicle and Fleet Management Perspective

Data for Vehicle and Fleet Management Perspective

DatesValueWeight
12.04.200937,063
13.04.200933,513


Number of Ambulances

  Name Start value End value Dynamic Measure units Optimization method Parent
Root Number of Ambulances UpGreenSLYellow 14,75 20,3 + 5,55 # Maximize Vehicle and Fleet Management Perspective
Description It indicates the number of ambulances that are the part of vehicle fleet of the emergency service organization.


Graph for Number of Ambulances

Graph for Number of Ambulances

Data for Number of Ambulances

DatesWeightMinMaxValue
12.04.20092106014,75
13.04.20092106020,3


Number of Rapid Response Vehicles

  Name Start value End value Dynamic Measure units Optimization method Parent
Root Number of Rapid Response Vehicles DownRedSLYellow 23,27 14,63 -8,64 # Maximize Vehicle and Fleet Management Perspective
Description It indicates the number of rapid response vehicles that the emergency and ambulance service organization has.


Graph for Number of Rapid Response Vehicles

Graph for Number of Rapid Response Vehicles

Data for Number of Rapid Response Vehicles

DatesWeightMinMaxValue
12.04.2009355023,27
13.04.2009355014,63


% rise in Patient Transport Service (PTS) Vehicles

  Name Start value End value Dynamic Measure units Optimization method Parent
Root % rise in Patient Transport Service (PTS) Vehicles UpGreenSLRed 16,84 29,95 + 13,11 % Maximize Vehicle and Fleet Management Perspective
Description It shows the % rise in Patient Transport Service (PTS) Vehicles over the last 1 year.


Graph for % rise in Patient Transport Service (PTS) Vehicles

Graph for % rise in Patient Transport Service (PTS) Vehicles

Data for % rise in Patient Transport Service (PTS) Vehicles

DatesWeightMinMaxValue
12.04.20093104016,84
13.04.20093104029,95


Pre Hospital Medical Equipment Perspective

  Name Start value End value Dynamic Parent Contains
Root Pre Hospital Medical Equipment Perspective SLYellow 52,07 % 73,15 % + 21,08% Emergency and Ambulance Service Scorecard
Indicators
% of Vehicles Equipped with Basic Medical Amenities
% of Vehicles Equipped with Advanced Medical Equipment
Average Replacement Time of Equipment
% Dip in Number of Medical Equipment of which Replacement is Due *
* - Information for this metric is limited in sample report Description This perspective shows how well the pre hospital medical equipment are managed by the emergency service organization.

Graph for Pre Hospital Medical Equipment Perspective

Graph for Pre Hospital Medical Equipment Perspective

Data for Pre Hospital Medical Equipment Perspective

DatesValueWeight
12.04.200952,073
13.04.200973,153


% of Vehicles Equipped with Basic Medical Amenities

  Name Start value End value Dynamic Measure units Optimization method Parent
Root % of Vehicles Equipped with Basic Medical Amenities UpGreenSLRed 83,08 97,66 + 14,58 % Maximize Pre Hospital Medical Equipment Perspective
Description It refers the % of vehicles that are equipped with basic medical amenities needed to provide acute medical care to the patients. It includes stretchers, carrying chairs, first-aid kits, etc.


Graph for % of Vehicles Equipped with Basic Medical Amenities

Graph for % of Vehicles Equipped with Basic Medical Amenities

Data for % of Vehicles Equipped with Basic Medical Amenities

DatesWeightMinMaxValue
12.04.200928010083,08
13.04.200928010097,66


% of Vehicles Equipped with Advanced Medical Equipment

  Name Start value End value Dynamic Measure units Optimization method Parent
Root % of Vehicles Equipped with Advanced Medical Equipment UpGreenSLYellow 82 84,45 + 2,45 % Maximize Pre Hospital Medical Equipment Perspective
Description It indicates the % of vehicles that are equipped with advanced medical equipment like Pneumatic Resuscitator and Oxygen Flowmeters, Defibrillator and Electronic Suction Units, etc.


Graph for % of Vehicles Equipped with Advanced Medical Equipment

Graph for % of Vehicles Equipped with Advanced Medical Equipment

Data for % of Vehicles Equipped with Advanced Medical Equipment

DatesWeightMinMaxValue
12.04.200935010082
13.04.200935010084,45


Average Replacement Time of Equipment

  Name Start value End value Dynamic Measure units Optimization method Parent
Root Average Replacement Time of Equipment DownGreenSLYellow 5,045 3,39 -1,655 years Minimize Pre Hospital Medical Equipment Perspective
Description It shows the average time in which medical equipment are replaced.


Graph for Average Replacement Time of Equipment

Graph for Average Replacement Time of Equipment

Data for Average Replacement Time of Equipment

DatesWeightMinMaxValue
12.04.20093385,045
13.04.20093383,39


Operational Efficiency Perspective

  Name Start value End value Dynamic Parent Contains
Root Operational Efficiency Perspective SLYellow 55,18 % 47,74 % -7,44% Emergency and Ambulance Service Scorecard
Indicators
Accident and Emergency (A&E) Vehicles Availability
Patient Transport Service (PTS) Vehicles Availability
% Reduction in Vehicle Breakdowns
% Dip in Safety Inspection Slippages *
Competence Level of Medical Staff *
* - Information for this metric is limited in sample report Description This perspective helps in judging the operational efficiency of the emergency and ambulance service organization.

Graph for Operational Efficiency Perspective

Graph for Operational Efficiency Perspective

Data for Operational Efficiency Perspective

DatesValueWeight
12.04.200955,182
13.04.200947,742


Accident and Emergency (A&E) Vehicles Availability

  Name Start value End value Dynamic Measure units Optimization method Parent
Root Accident and Emergency (A&E) Vehicles Availability UpGreenSLYellow 93,99 98,28 + 4,29 % Maximize Operational Efficiency Perspective
Description It indicates the availability rate of Accident and Emergency (A&E) Vehicles.


Graph for Accident and Emergency (A&E) Vehicles Availability

Graph for Accident and Emergency (A&E) Vehicles Availability

Data for Accident and Emergency (A&E) Vehicles Availability

DatesWeightMinMaxValue
12.04.200929010093,99
13.04.200929010098,28


Patient Transport Service (PTS) Vehicles Availability

  Name Start value End value Dynamic Measure units Optimization method Parent
Root Patient Transport Service (PTS) Vehicles Availability DownRedSLRed 97,87 85,285 -12,59 % Maximize Operational Efficiency Perspective
Description It refers the availability rate of Patient Transport Service (PTS) Vehicles.


Graph for Patient Transport Service (PTS) Vehicles Availability

Graph for Patient Transport Service (PTS) Vehicles Availability

Data for Patient Transport Service (PTS) Vehicles Availability

DatesWeightMinMaxValue
12.04.200928510097,87
13.04.200928510085,285


% Reduction in Vehicle Breakdowns

  Name Start value End value Dynamic Measure units Optimization method Parent
Root % Reduction in Vehicle Breakdowns DownRedSLYellow 49,45 20,45 -29 % Maximize Operational Efficiency Perspective
Description It shows the % reduction in vehicle breakdown experienced over the last 6 months.

Graph for % Reduction in Vehicle Breakdowns

Graph for % Reduction in Vehicle Breakdowns

Data for % Reduction in Vehicle Breakdowns

DatesWeightMinMaxValue
12.04.20092207049,45
13.04.20092207020,45


Support Centre and Service Reach Perspective

  Name Start value End value Dynamic Parent Contains
Root Support Centre and Service Reach Perspective SLYellow 55,9 % 61,01 % + 5,11% Emergency and Ambulance Service Scorecard
Indicators
Average Call Response Time
% Dip in Abandoned/Terminated Calls
Average Time Lag
Hit Rate *
* - Information for this metric is limited in sample report Description This perspective highlights the efficiency of support centre and service reach aspect of the emergency and ambulance service organization.

Graph for Support Centre and Service Reach Perspective

Graph for Support Centre and Service Reach Perspective

Data for Support Centre and Service Reach Perspective

DatesValueWeight
12.04.200955,92
13.04.200961,012


Average Call Response Time

  Name Start value End value Dynamic Measure units Optimization method Parent
Root Average Call Response Time DownGreenSLYellow 20,47 10,72 -9,75 seconds Minimize Support Centre and Service Reach Perspective
Description It refers to the average call response time of the support center.


Graph for Average Call Response Time

Graph for Average Call Response Time

Data for Average Call Response Time

DatesWeightMinMaxValue
12.04.20093104020,47
13.04.20093104010,72


% Dip in Abandoned/Terminated Calls

  Name Start value End value Dynamic Measure units Optimization method Parent
Root % Dip in Abandoned/Terminated Calls DownRedSLYellow 53,565 27,87 -25,69 % Maximize Support Centre and Service Reach Perspective
Description It shows the % dip in number of calls that are abandoned or terminated.


Graph for % Dip in Abandoned/Terminated Calls

Graph for % Dip in Abandoned/Terminated Calls

Data for % Dip in Abandoned/Terminated Calls

DatesWeightMinMaxValue
12.04.20092156053,565
13.04.20092156027,87


Average Time Lag

  Name Start value End value Dynamic Measure units Optimization method Parent
Root Average Time Lag DownGreen 28,394 11,806 -16,59 minutes Minimize Support Centre and Service Reach Perspective
Description It shows the average time taken by the medical team to reach the emergency scene.


Graph for Average Time Lag

Graph for Average Time Lag

Data for Average Time Lag

DatesWeightMinMaxValue
12.04.2009383028,394
13.04.2009383011,806
Created by: AKS-Labs
Report created with Balanced Scorecard Designer at 08.04.2009 22:56:27

Copyright © 2000-2012 AKS-Labs. All rights reserved.