This is a Office Maintenance Metric Dashboard (Diamond) Report, it is one of reports that Balanced Scorecard Designer can generate for Office Maintenance KPI. With this software you can also design your own scorecards, KPIs and metrics.


Office Maintenance Balanced Scorecard

Report includes: 2 day(s), from 19.01.2009 to 20.01.2009

  Name Start value End value Dynamic Contains
Root Office Maintenance Balanced Scorecard  63,16 % 40,38 % -22,78 %
Financial Perspective(44,8%, 1,44%Up)
Quality Assurance and Reliability Perspective(29,4%, -50,17%Down)
Internal Operations Perspective(61%, -2,96%Down)
Employee Education and Safety Perspective(29,5%, -37,84%Down)

Graph for Office Maintenance Balanced Scorecard

Graph for Office Maintenance Balanced Scorecard

Data for Office Maintenance Balanced Scorecard

DatesValue
19.01.200963,16
20.01.200940,38


Financial Perspective

  Name Start value End value Dynamic Parent Contains
Root Financial Perspective SLYellow 43,38 % 44,82 % + 1,44% Office Maintenance Balanced Scorecard
Indicators
% rise in Material cost
Fraction of Budget spent on Advanced Equipments and Techniques
% increase in Training Expenditure
% rise in other operating Costs *
* - Information for this metric is limited in sample report Description This group of indicators is to gather information about the financial aspect of the offcie maintenance activities in the company.

Graph for Financial Perspective

Graph for Financial Perspective

Data for Financial Perspective

DatesValueWeight
19.01.200943,383
20.01.200944,823


% rise in Material cost

  Name Start value End value Dynamic Measure units Optimization method Parent
Root % rise in Material cost DownGreenSLYellow 19,12 18,06 -1,06 % Minimize Financial Perspective
Description This indicator is equal to the % rise in the cost of material used in the office maintenance processes.

Graph for % rise in Material cost

Graph for % rise in Material cost

Data for % rise in Material cost

DatesWeightMinMaxValue
19.01.2009352519,12
20.01.2009352518,06


Fraction of Budget spent on Advanced Equipments and Techniques

  Name Start value End value Dynamic Measure units Optimization method Parent
Root Fraction of Budget spent on Advanced Equipments and Techniques DownRedSLYellow 0,04852 0,04141 -0,00711 # Maximize Financial Perspective
Description This KPI gives the fraction of budget that is being spent on advanced office maintenance equipments and techniques.

Graph for Fraction of Budget spent on Advanced Equipments and Techniques

Graph for Fraction of Budget spent on Advanced Equipments and Techniques

Data for Fraction of Budget spent on Advanced Equipments and Techniques

DatesWeightMinMaxValue
19.01.200930,010,10,04852
20.01.200930,010,10,04141


% increase in Training Expenditure

  Name Start value End value Dynamic Measure units Optimization method Parent
Root % increase in Training Expenditure UpGreen 27,72 37,44 + 9,72 % Maximize Financial Perspective
Description This parameter is needed to ensure that a small increase in 'expenditure for training' the staff occurs.

Graph for % increase in Training Expenditure

Graph for % increase in Training Expenditure

Data for % increase in Training Expenditure

DatesWeightMinMaxValue
19.01.20092105027,72
20.01.20092105037,44


Quality Assurance and Reliability Perspective

  Name Start value End value Dynamic Parent Contains
Root Quality Assurance and Reliability Perspective SLYellow 79,62 % 29,45 % -50,17% Office Maintenance Balanced Scorecard
Indicators
Number of eco-friendly solutions offered
Number of quality standards met
Frequency of Inspections
% increase in positive feedbacks *
* - Information for this metric is limited in sample report Description This category of KPIs is for keeping a check on the quality of process, on a continuous basis.

Graph for Quality Assurance and Reliability Perspective

Graph for Quality Assurance and Reliability Perspective

Data for Quality Assurance and Reliability Perspective

DatesValueWeight
19.01.200979,623
20.01.200929,453


Number of eco-friendly solutions offered

  Name Start value End value Dynamic Measure units Optimization method Parent
Root Number of eco-friendly solutions offered DownRedSLRed 9,244 6,358 -2,886 # Maximize Quality Assurance and Reliability Perspective
Description Organizations engaged in office maintenance utilize a number of chemicals and cleaning agents. Taking care that these degrade the environment minimally is one of the greatest concerns of such groups. Some of the ways to do this include 'using recycled paper', 'getting the chemicals green certified'.

Graph for Number of eco-friendly solutions offered

Graph for Number of eco-friendly solutions offered

Data for Number of eco-friendly solutions offered

DatesWeightMinMaxValue
19.01.200924109,244
20.01.200924106,358


Number of quality standards met

  Name Start value End value Dynamic Measure units Optimization method Parent
Root Number of quality standards met DownRedSLYellow 4,396 1,4 -2,996 # Maximize Quality Assurance and Reliability Perspective
Description This is to know the number of quality standards that are being met by the office maintenance staff to ensure hygienic environment in the office space.

Graph for Number of quality standards met

Graph for Number of quality standards met

Data for Number of quality standards met

DatesWeightMinMaxValue
19.01.20093154,396
20.01.20093151,4


Frequency of Inspections

  Name Start value End value Dynamic Measure units Optimization method Parent
Root Frequency of Inspections DownRed 17,754 9,798 -7,956 # Maximize Quality Assurance and Reliability Perspective
Description It refers to the frequency with which inspections have been made to overview the workings of the office maintenance employees. It is calculated on a yearly basis.

Graph for Frequency of Inspections

Graph for Frequency of Inspections

Data for Frequency of Inspections

DatesWeightMinMaxValue
19.01.2009362417,754
20.01.200936249,798


Internal Operations Perspective

  Name Start value End value Dynamic Parent Contains
Root Internal Operations Perspective SLYellow 63,94 % 60,98 % -2,96% Office Maintenance Balanced Scorecard
Indicators
% savings in time per unit of task performed
Effectiveness Index per Employee
Number of office maintenance tasks undertaken
Number of communication platforms used *
* - Information for this metric is limited in sample report Description This group of indicators is to make sure that the internal environment of the organization is smooth.

Graph for Internal Operations Perspective

Graph for Internal Operations Perspective

Data for Internal Operations Perspective

DatesValueWeight
19.01.200963,942
20.01.200960,982


% savings in time per unit of task performed

  Name Start value End value Dynamic Measure units Optimization method Parent
Root % savings in time per unit of task performed UpGreenSLYellow 16,165 28,595 + 12,43 % Maximize Internal Operations Perspective
Description It refers to the % savings in time achieved by the office maintenance employees for per unit of task performed by them.

Graph for % savings in time per unit of task performed

Graph for % savings in time per unit of task performed

Data for % savings in time per unit of task performed

DatesWeightMinMaxValue
19.01.2009256016,165
20.01.2009256028,595


Effectiveness Index per Employee

  Name Start value End value Dynamic Measure units Optimization method Parent
Root Effectiveness Index per Employee DownRedSLYellow 0,982 0,8602 -0,122 # Maximize Internal Operations Perspective
Description This KPI can be calculated to know the effectiveness level of each member of the workforce engaged in office maintenance activities.

Graph for Effectiveness Index per Employee

Graph for Effectiveness Index per Employee

Data for Effectiveness Index per Employee

DatesWeightMinMaxValue
19.01.200930,710,982
20.01.200930,710,8602


Number of office maintenance tasks undertaken

  Name Start value End value Dynamic Measure units Optimization method Parent
Root Number of office maintenance tasks undertaken UpGreenSLYellow 13,12 17,56 + 4,44 # Maximize Internal Operations Perspective
Description Office maintenance workforce undertake a large number of activities in the compnay. Some of these include 'handling moving furniture', 'decoration work', 'maintaining records of complaints from staff', 'offering security solutions', 'cleaning jobs', 'janitorial services', etc.

Graph for Number of office maintenance tasks undertaken

Graph for Number of office maintenance tasks undertaken

Data for Number of office maintenance tasks undertaken

DatesWeightMinMaxValue
19.01.2009352513,12
20.01.2009352517,56


Employee Education and Safety Perspective

  Name Start value End value Dynamic Parent Contains
Root Employee Education and Safety Perspective SLYellow 67,35 % 29,51 % -37,84% Office Maintenance Balanced Scorecard
Indicators
Average training hours per employee
Number of safety measures adopted
% reduction in injury rate
Policy compliance level *
* - Information for this metric is limited in sample report Description This perspective helps in knowing the education and safety initiatives taken by the company for the office maintenance workforce.

Graph for Employee Education and Safety Perspective

Graph for Employee Education and Safety Perspective

Data for Employee Education and Safety Perspective

DatesValueWeight
19.01.200967,352
20.01.200929,512


Average training hours per employee

  Name Start value End value Dynamic Measure units Optimization method Parent
Root Average training hours per employee DownRedSLRed 4,312 2,904 -1,408 hrs Maximize Employee Education and Safety Perspective
Description It indicates the average training hours spent on each employee by the company. The value should be calculated on monthly basis.

Graph for Average training hours per employee

Graph for Average training hours per employee

Data for Average training hours per employee

DatesWeightMinMaxValue
19.01.200932104,312
20.01.200932102,904


Number of safety measures adopted

  Name Start value End value Dynamic Measure units Optimization method Parent
Root Number of safety measures adopted DownRed 7,448 6,8 -0,648 # Maximize Employee Education and Safety Perspective
Description It states the number of safety measures adopted to protect employees from undue injuries and mishaps.

Graph for Number of safety measures adopted

Graph for Number of safety measures adopted

Data for Number of safety measures adopted

DatesWeightMinMaxValue
19.01.20093587,448
20.01.20093586,8


% reduction in injury rate

  Name Start value End value Dynamic Measure units Optimization method Parent
Root % reduction in injury rate DownRedSLYellow 88,48 74,28 -14,2 % Maximize Employee Education and Safety Perspective
Description It refers to the % reduction in the injury rate suffered by the office maintenance staff.

Graph for % reduction in injury rate

Graph for % reduction in injury rate

Data for % reduction in injury rate

DatesWeightMinMaxValue
19.01.200926010088,48
20.01.200926010074,28
Created by: AKS-Labs
Report created with Balanced Scorecard Designer at 15.01.2009 20:14:03

Copyright © 2000-2012 AKS-Labs. All rights reserved.