| Cycle Effectiveness |
|
| Indicator |
Description |
| Run Rate |
The Total Number of Units divided by Operating Time |
| Actual Cycle Time |
Not available in trial report |
| Reduced Speed Threshold |
Not available in trial report | |
|
| Quality Loss |
|
| Indicator |
Description |
| Rework Units |
The Number of Reworked Units divided by the Total Number of Units, multiplied by... |
| Reject Units |
Not available in trial report |
| Unit Quality Loss |
Not available in trial report | |
|
|
| |
|
|
|
|
| Maintenance Effectiveness |
|
| Indicator |
Description |
| Mean Time Between Failures |
The average time between failures of a system |
| Percent Reactive Maintenance |
Not available in trial report |
| Percent Proactive Maintenance |
Not available in trial report |
| Mean time to repair (MTTR) |
Not available in trial report | |
|
|
|
|
|
|
|
Continuous Improvement |
|
|
|
Continuous Improvement scorecard allows to measure and control performance with ...
Created by AKS-Labs |
|
|
|
| Equipment Effectiveness |
|
| Indicator |
Description |
| Availability |
The Operating Time divided by the Planned Production Time multiplied by 100 |
| Performance |
Not available in trial report |
| Quality |
Not available in trial report |
| Overall Equipment Effectiveness |
Not available in trial report | |
| |
|
|
|
|
|
|
| Non-Operating Time |
|
| Indicator |
Description |
| Changeover Time |
The Number of Hours Lost swapping equipment divided by the Total Number of Hours... |
| Breakdowns |
Not available in trial report |
| Setup and Adjustments |
Not available in trial report | |
|
|